Watch It Rise: A Step-by-Step journey

Follow along as we build our home. We are capturing every major milestone, from demolition to the finishing touches

Found it, bought it, building it... 

April 19, 2024 

Turning a perfect location into our dream home, the journey begins.

Job Site Preparation

May 28, 2025 

Preventing Construction Damage to Existing Trees

Temporary Construction Fence

June 28, 2025 

Construction Site Security Fencing

Breaking Ground (Literally)

July 25, 2025  (9:32 AM )

We’ve officially begun the process of "unbuilding." 

The Final Fall

July 25, 2025 ( 3:13 PM )

Making a Mess, for a Good Reason.

From Structure to Site

August 1, 2025 

Transforming Demolition Sites into Ready-to-Build Land.

Stabilized construction entrance

August 13, 2025 

Temporary gravel pad installed at the entry/exit points of the job site

Tree Removal

August 29, 2025 

It was heartbreaking to cut it down, but we are making room for new green life in our land and public areas

Boundary /Construction Survey

Oct 3, 2025 

Survey to mark set backs and reference points

Logistics & Setup

Oct 5, 2025 

Our team is preparing the site to maintain optimal conditions and high productivity for the next 18 months

Solid Foundations Start here

Oct 14, 2025 

Ensuring the ground is prepared to support the structure's load-bearing walls, footings, all the happiness we will have inside

Structural Foundation Work

Oct 31, 2025 

Installing rebar and creating a structural steel grid

Pouring Footing's Concrete

Nov 14, 2025 

Installing rebar and creating a structural steel grid

Foundations Done

Nov 19, 2025 

The home is anchored to the ground

Installation of concrete masonry units

Nov 21, 2025 

Laying blocks on a concrete footing

1st Backfill

Dec 6, 2025 

The 1st backfill, compacted to provide structural support, stability, and proper drainage

Underground work.  Electrical and Plumbing

Dec 10, 2025 

Pipelines and conduits

2nd Backfill

Dec 12, 2025 

Looking good... and leveled

Moisture barrier

Dec 19, 2025 

Protective layer, coating, or membrane designed to prevent water, vapor, or humidity from infiltrating and damaging materials

Pouring concrete slab @ Ground Level

Dec 26, 2025 

The team is delivering outstanding work

Delivery of more CMU

Jan 6, 2026 (8 am....)

Yes... we need more.. lots more

Installation of CMU in exterior walls from ground floor to tie beams

Jan 6, 2026 (end of the day)

Concrete walls are officially up..

Framing from ground floor to tie beams

Jan 16, 2026 

Framing in progress! Coming together nicely.

Concrete Forms, Rebar, and Bracing Systems 

Jan 22, 2026 

Temporary Framing for a forever house

Pouring Concrete

Jan 27, 2026 

Executing according to timeline

Preparation for Concrete Slab @ Second Level

Jan 29, 2026 

Setting the stage for a solid foundation: Rebar, formwork, and prep work in progress for the second-level concrete slab. 